Table of Contents

Search

  1. Preface
  2. Analyst Service
  3. Content Management Service
  4. Data Integration Service
  5. Data Integration Service Architecture
  6. Data Integration Service Management
  7. Data Integration Service Grid
  8. Data Integration Service Applications
  9. Metadata Manager Service
  10. Model Repository Service
  11. PowerCenter Integration Service
  12. PowerCenter Integration Service Architecture
  13. High Availability for the PowerCenter Integration Service
  14. PowerCenter Repository Service
  15. PowerCenter Repository Management
  16. PowerExchange Listener Service
  17. PowerExchange Logger Service
  18. Reporting Service
  19. Reporting and Dashboards Service
  20. SAP BW Service
  21. Search Service
  22. System Services
  23. Test Data Manager Service
  24. Web Services Hub
  25. Application Service Upgrade
  26. Application Service Databases
  27. Connecting to Databases from Windows
  28. Connecting to Databases from UNIX
  29. Updating the DynamicSections Parameter of a DB2 Database

Resources

Resources

You can configure the PowerCenter Integration Service to check the resources available on each node and match them with the resources required to run the task. If you configure the PowerCenter Integration Service to run on a grid and to check resources, the Load Balancer dispatches a task to a node where the required PowerCenter resources are available. For example, if a session uses an SAP source, the Load Balancer dispatches the session only to nodes where the SAP client is installed. If no available node has the required resources, the PowerCenter Integration Service fails the task.
You configure the PowerCenter Integration Service to check resources in the Administrator tool.
You define resources available to a node in the Administrator tool. You assign resources required by a task in the task properties.
The PowerCenter Integration Service writes resource requirements and availability information in the workflow log.