Table of Contents

Search

  1. Preface
  2. PowerExchange Installation and Upgrade Overview
  3. Installation Planning
  4. Upgrade Planning
  5. Installing and Upgrading PowerExchange on IBM i
  6. Installing and Upgrading PowerExchange on Linux and UNIX
  7. Installing and Upgrading PowerExchange on Windows
  8. Installing and Upgrading PowerExchange on z/OS
  9. Appendix A: Upgrade Considerations
  10. Appendix B: PowerExchange Environment
  11. Appendix C: Manual Installation on IBM i

Installation and Upgrade Guide

Installation and Upgrade Guide

Rematerialization of Targets for Sessions with IMS Synchronous CDC Sources

Rematerialization of Targets for Sessions with IMS Synchronous CDC Sources

After you install PowerExchange 10.5, you must re-materialize the targets in CDC sessions that have an IMS synchronous CDC source if the source is a Fast Path database with more than 255 areas and if any of the following conditions are true:
  • You capture data from a non-keyed or non-unique keyed segment.
  • You capture data from a segment beneath a non-keyed or non-unique keyed segment in the database hierarchy.
  • You use the GetDatabaseKey or GetIMSRBAByLevel functions in any of the data maps that are defined for the database.
If you do not re-materialize the targets after installing PowerExchange 10.5, the change apply process might encounter errors when updating targets that depend on the IMS concatenated key or the results of the GetDatabaseKey or GetIMSRBAByLevel functions.