Table of Contents

Search

  1. Preface
  2. Upgrade Overview
  3. Before You Upgrade the Domain on Linux
  4. Before You Upgrade the Domain on UNIX
  5. Before You Upgrade the Domain on Windows
  6. Prepare for the Upgrade
  7. Upgrade the Domain
  8. Upgrade the Domain with Changes to Node Configuration
  9. Before You Upgrade the Application Services
  10. Application Service Upgrade
  11. Informatica Client Upgrade
  12. After You Upgrade
  13. Upgrade Checklist

Upgrading from Version 10.0 (10.4.1)

Upgrading from Version 10.0 (10.4.1)

Shut Down the Domain

Shut Down the Domain

You can stop all the application services before you shut down the domain.You must shut down the domain before you back up domain and then upgrade the domain.
To shut down the domain, stop the Informatica service process on each node in the domain.
You can stop the Informatica service process on each node using one of the following methods based on the supported environment:
  • To stop the Informatica from the Windows Start menu, click
    Programs
    Informatica[Version]
    Server
    Stop Informatica Services
    .
  • To stop Informatica on UNIX, you use the
    infaservice
    command. By default, the
    infaservice
    executable file is installed in the following directory:
    <Informatica installation directory>/tomcat/bin
    Enter the following command to stop the daemon:
    infaservice shutdown
You can also stop the Informatica service from the Windows control panel or from the Administrator tool based on the supported environment.

0 COMMENTS

We’d like to hear from you!