Building a Gateway

Building a Gateway

Use the following procedure to build a gateway:
  1. From the
    Gateway
    palette, drag a gateway to the Process Editor canvas.
  2. Drag an activity, such as invoke, either below or above the gateway to automatically link it into a sequence.
  3. If desired, add another activity to the canvas and link the two activities.
  4. For tips on designing with links, see Adding a Link with a Transition Condition.
  5. As desired, add transitions conditions to links, and then select the corresponding Gateway Type from the Properties view.