When you create a subscription task you select mapping that you created for the subscription
and select the
Cloud Integration Hub
connection as the source of the task
.
The mapping must exist in Mapping Designer before you configure the task.
In
Data Integration
, click
New
Mapping Task
Create
.
Specify the following task details:
Task Name
Enter a name for the task.
The name of the task must be unique within the organization. The task name is not case sensitive.
The task name can contain alphanumeric characters, spaces, and the following special characters: _ . + -
Indicate the type of the task in the task name. This will ensure that when you select a task to use in a
Cloud Integration Hub
publication workflow, you select a publication task. For example, name the task
Pub_<TaskName>
.
Description
Optionally, enter a description for the task. The description can contain up to 255 characters.
Runtime Environment
Runtime environment that contains the Secure Agent to run the task.
Mapping
Mapping associated with the task. Select the subscription mapping.
To select a mapping, click
Select
. The
Select a Mapping
dialog box displays up to 200 mappings. If the mapping you want to use does not display, enter a search string to reduce the number of mappings that display.
Select a mapping and click
OK
.
An image of the mapping displays below the mapping name.
Click the
Sources
tab and then, from the
Connection
list, select the
Cloud Integration Hub
connection.
From the
Objects
list, select the topic table from which to consume data.
In the
Query Options
section, you can filter or sort data based on one or more fields.
You can't sort a
Text
data type field because you can't mark it as a
Filter Accelerator
.
You can't sort a
String
data type with precision greater than 1024.
You can sort values for each field.
On the
Targets
tab, select a target connection that connects to the target into which you want to write data.
On the
Input Parameters
tab, map the fields in the
Source
column to fields in the
Target
column, and then click
Next
.
On the
Schedule
tab, verify that the option
Do not run this task on a schedule
is selected. The task runs according to the schedule of the publication that uses the task. Optionally, you can run multiple instances of a mapping task simultaneously. To enable simultaneous task runs, select the
Allow the mapping task to be executed simultaneously