Table of Contents

Search

  1. Preface
  2. Understanding PowerExchange for Siebel
  3. PowerExchange for Siebel Configuration
  4. Siebel Sources
  5. Application Source Qualifier for Siebel Sources
  6. Siebel Targets
  7. Siebel Business Service Transformation
  8. Siebel EIM Read Transformation
  9. Siebel EIM Load Transformation
  10. Siebel EIM Invoker Transformation
  11. Siebel Sessions
  12. Appendix A: Datatype Reference
  13. Appendix B: Error Messages
  14. Appendix C: Glossary

PowerExchange for Siebel User Guide for PowerCenter

PowerExchange for Siebel User Guide for PowerCenter

Rules and Guidelines for the Siebel EIM Load Transformation

Rules and Guidelines for the Siebel EIM Load Transformation

Use the following rules and guidelines when you link a source to the Siebel EIM Load transformation:
  • The batch number must be between 0 and 2147483647.
  • If the EIM table contains the value in the LOV Type column and you configure the session to validate data against the LOV values, the source data must contain valid LOV values.

0 COMMENTS

We’d like to hear from you!