Installation and Upgrade Guide

Installation and Upgrade Guide

Task Flow for a Full Installation on z/OS

Task Flow for a Full Installation on z/OS

To install PowerExchange on z/OS, install the PowerExchange base software. Also, install the PowerExchange Change Data Capture (CDC) software and the PowerExchange software for selected data sources if applicable.
Use the following checklist of tasks to complete a full installation of PowerExchange:
Check
Task
Required or Optional
Phase I. Install the PowerExchange Base Software
Required
Required
Required
Required
Required
Required
Required
Optional. Perform this step if you want PowerExchange to use the z/OS Cryptographic Services ICSF to perform AES-128 encryption of user names and passwords.
Required
Required if you use RACF
Phase II. Install the PowerExchange CDC Software
Required if you use CDC
Required if you use CDC
Required if you use CDC
Required if you use CDC
Required if you use CDC
Required if you use CDC and RACF
Required if you use CDC
Required if you use CDC
Phase III. Install the PowerExchange Software for Specific Data Sources
Required for some data sources
Required for DB2 for z/OS data sources
Optional for IDMS data sources
Required for IMS synchronous CDC data sources if you use the PowerExchange CRG.LOAD library
Phase IV. Delete Previously Copied RUNLIB Members
Optional
Optional