Table of Contents

Search

  1. Preface
  2. Installation Overview
  3. Pre-Installation Tasks
  4. Hub Store Installation
  5. Hub Server Installation
  6. Hub Server Post-Installation Tasks
  7. Process Server Installation
  8. Process Server Post-Installation Tasks
  9. ActiveVOS Post-Installation Tasks for the Application Server
  10. ActiveVOS Post-Installation Tasks for the Business Entity Adapter
  11. Resource Kit Installation
  12. Resource Kit Post-Installation Tasks
  13. Troubleshooting the MDM Hub
  14. Uninstallation

Installation Guide for IBM DB2 with Red Hat JBoss

Installation Guide for IBM DB2 with Red Hat JBoss

Additional Application Server Configuration (Optional)

Additional Application Server Configuration (Optional)

Perform additional JBoss configuration based on the requirements of the MDM Hub environment.
The following table describes the configurations that you can perform:
Configuration
Description
Configuring JBoss for standalone Process Server instances
Required to configure JBoss for standalone Process Server instances in the following scenarios:
  • You want to install a
    Process Server
    instance on a JBoss instance on which you do not have the Hub Server installed.
  • You want to install multiple, standalone
    Process Server
    instances.
Configuring EJB security
Required if you want to configure EJB security at the JBoss application server level.