Table of Contents

Search

  1. Preface
  2. Installation Overview
  3. Pre-Installation Tasks
  4. Hub Store Installation
  5. Hub Store Post-Installation Tasks
  6. Hub Server Installation
  7. Hub Server Post-Installation Tasks
  8. Process Server Installation
  9. Process Server Post-Installation Tasks
  10. ActiveVOS Post-Installation Tasks for the Application Server
  11. ActiveVOS Post-Installation Tasks for the Business Entity Adapter
  12. Resource Kit Installation
  13. Troubleshooting the MDM Hub
  14. Uninstallation

Installation Guide for Oracle Database with Red Hat JBoss

Installation Guide for Oracle Database with Red Hat JBoss

Install the Process Server on Nodes in the Cluster

Install the
Process Server
on Nodes in the Cluster

In application server cluster environments, install the
Process Server
on all nodes of the cluster to which you must deploy the
Process Server
application. You must complete the installation on one node of a cluster before you proceed to install on another node of a cluster.
For example, a JBoss cluster has two nodes that run in host1 and host2 and use RMI ports 4447 and 4448. You need to install the
Process Server
on node1 and node2. You must complete the
Process Server
installation on any one node, such as node2, before you start installation on the other node, node1.
Ensure that the directory structure of the
Process Server
installation is the same on all the nodes.
  1. Start the JBoss application server on each cluster node.
  2. Navigate to the following directory:
    <
    MDM Hub distribution directory
    >/<
    operating system name
    >/mrmcleanse
  3. Navigate to the following directory:
    <
    MDM Hub distribution directory
    >/<
    operating system name
    >/mrmcleanse
  4. To start the
    Process Server
    installer on a cluster node, run the command for your operating system:
    UNIX
    .
    ./hub_cleanse_install.bin
    Windows
    .
    hub_cleanse_install.exe
    The
    Process Server
    installation wizard starts.
  5. Follow the online instructions. When prompted, enter the installation values that you collected.
  6. Next step
    : After the installation completes, deploy the
    Process Server
    manually on all the nodes that have the installation.
    If you performed an automatic deployment for the primary node, you do not need to manually deploy on the primary node.

0 COMMENTS