Table of Contents

Search

  1. Preface
  2. Introduction
  3. IDD Concepts
  4. Implementation Process
  5. IDD Configuration Manager
  6. Manual IDD Configuration
  7. IDD Global Properties
  8. Appendix A: Sizing and Platform Requirements
  9. Appendix B: Application Components
  10. Appendix C: IDD Security Configuration
  11. Appendix D: Data Security
  12. Appendix E: Example Role-Based Security Configuration
  13. Appendix F: Data Masking
  14. Appendix G: Siperian BPM Workflow Engine
  15. Appendix H: Locale Codes
  16. Appendix I: Troubleshooting
  17. Appendix J: Glossary

Data Director Implementation Guide

Data Director Implementation Guide

creationType

creationType

This attribute should not be modified for existing tasks.
This is used to determine where a task can be created in an IDD application. The possible values are:
creationType
Description
create
Tasks are created when the IDD application user chooses Create Task from a menu in an IDD application.
When creating a task using
More Actions
Create Task
, in the
Create Task
window, only those tasks configured as
CREATE
for the
Creation Type
option will be listed in the
Type
drop-down field.
merge
A task is created when the IDD application user chooses the command to create a task in the Potential Matches view.
Only one task type must have this designation.
unmerge
Tasks are created when the IDD application user chooses the command to create a task in the Cross References dialog.
Only one task type must have this designation.
none
Tasks cannot be created by an IDD application user in the IDD application. This designation means that these task types can only be created as a result of a workflow.
The FinalReview task type has this designation in the previous code example because this task type can only be created as part of a flow (when the Escalate action is executed on a ReviewNoApprove task).

0 COMMENTS

We’d like to hear from you!