PowerCenter
- PowerCenter 10.5
- 所有产品
DIRECTOR> PETL_24044 The Master DTM will now connect and fetch the prepared session from the Preparer DTM. DIRECTOR> PETL_24047 The Master DTM has successfully fetched the prepared session from the Preparer DTM. DIRECTOR> DISP_20305 The [Master] DTM with process id [2968] is running on node [sapphire]. : (Mon Apr 03 16:19:47 2006) DIRECTOR> TM_6721 Started [Connect to Repository]. DIRECTOR> TM_6722 Finished [Connect to Repository]. It took [0.656233] seconds. DIRECTOR> TM_6794 Connected to repository [HR_80] in domain [StonesDomain] user [ellen] DIRECTOR> TM_6014 Initializing session [s_PromoItems] at [Mon Apr 03 16:19:48 2006] DIRECTOR> TM_6683 Repository Name: [HR_80] DIRECTOR> TM_6684 Server Name: [Copper] DIRECTOR> TM_6686 Folder: [Snaps] DIRECTOR> TM_6685 Workflow: [wf_PromoItems] DIRECTOR> TM_6101 Mapping name: m_PromoItems [version 1] DIRECTOR> SDK_1805 Recovery cache will be deleted when running in normal mode. DIRECTOR> SDK_1802 Session recovery cache initialization is complete.
DIRECTOR> TM_6703 Session [s_PromoItems] is run by 32-bit Integration Service [sapphire], version [8.1.0], build [0329].