Table of Contents

Search

  1. Preface
  2. Installation Overview
  3. Before You Begin
  4. Pre-Installation Tasks
  5. B2B Data Exchange Installation
  6. Post-Installation Tasks
  7. Installing the Partners Portal on Non-B2B Data Exchange Nodes
  8. Upgrading B2B Data Exchange
  9. Starting and Stopping B2B Data Exchange
  10. Optional B2B Data Exchange Configuration
  11. Installing and Configuring the B2B Data Exchange Accelerator for Data Archive
  12. Uninstallation

Installation and Configuration Guide

Installation and Configuration Guide

Configuring the pmrep Process Pool

Configuring the pmrep Process Pool

Speed up the system response time when you create connections, topics, publications, and subscriptions in the
B2B Data Exchange
Operation Console.
This procedure is relevant to systems running PowerCenter 9.5.1 HotFix 4 and PowerCenter 9.6.1 HotFix 1 or higher.
Based on your PowerCenter version, get one of the following Informatica EBFs:
  • For PowerCenter 9.6.1 HotFix 1: EBF14598
  • For PowerCenter 9.5.1 HotFix 4: EBF14597
  1. On the computer where
    B2B Data Exchange
    is installed, back up the following folder:
    <INFA_HOME>\server\bin
    .
  2. Copy the EBF to the
    <INFA_HOME>\server\bin
    folder.
  3. Open the EBF file and extract the library that corresponds to your operating system to the
    <INFA_HOME>\server\bin
    folder.
  4. On the machine where
    B2B Data Exchange
    is installed, open the server and console copies of the
    dx-configuration.properties
    files in a text editor from the following locations:
    <
    DX
    InstallationDir>\
    DataExchange
    DataIntegrationHub
    \tomcat\shared\classes\
    <
    DX
    InstallationDir>\conf\
  5. Enable following properties in both the
    dx-configuration.properties
    files:
    #pwc.pmrep.use.process.pool=true
    #pwc.pmrep.process.pool.max=5
  6. Save the
    dx-configuration.properties
    files.