Table of Contents

Search

  1. Preface
  2. Introduction to High Availability
  3. Set Up the High Availability Environment
  4. Configure JMS Discovery
  5. Configure RMI Connections
  6. Configure the Operation Console
  7. Configure an HTTP Load Balancer
  8. Configure the Dashboard and Reports
  9. Troubleshooting High Availability
  10. High Availability Log Messages
  11. Port Number Reference
  12. Glossary

High Availability Guide

High Availability Guide

Configuration Checklist

Configuration Checklist

Follow the high-level steps to configure the high availability environment. The actual steps may vary according to the cluster type and the
Data Integration Hub
components that you use.
To configure the high availability environment, complete the following tasks:
  1. Complete the prerequisites tasks and set up the high availability environment.
  2. Configure RMI connections for the
    Data Integration Hub
    server and the Power Center Integration Service.
  3. Configure the Operation Console. For single-machine clusters, modify Tomcat ports for each subsequent Operation Console instance.
  4. Configure an HTTP load balancer to distribute data transfer between the Operation Console browsers and the Tomcat server.
  5. Configure the Dashboard and reports system properties and Logi Info settings. This task is required only if you installed the Dashboard and Reports component.