Table of Contents

Search

  1. Preface
  2. Installation Overview
  3. Before You Install
  4. Data Archive Installation
  5. Data Vault Installation
  6. Application Accelerator Installation
  7. Application Retirement for Healthcare Accelerator Installation
  8. MongoDB Accelerator Installation
  9. Salesforce Accelerator Installation
  10. After You Install
  11. Data Archive Upgrade
  12. Data Vault Upgrade
  13. Upgrading Oracle History Data
  14. Upgrading PeopleSoft History Data
  15. ILM Data Validation Option Setup
  16. Data Archive Source and Target Database Requirements
  17. Data Archive Connectivity
  18. Data Archive Uninstallation
  19. SAP Application Retirement
  20. Database Users and Privileges
  21. Data Visualization Designer Installation
  22. Data Archive Installation Requirements Checklist and Architecture Options

Installation and Upgrade Guide

Installation and Upgrade Guide

SAP Application Retirement

SAP Application Retirement

Verify that you have staging space for retirement jobs that archive SAP applications. File system staging space is required to archive attachments.
To retire attachments from SAP applications, you must have staging space in a file system that is accessible to the SAP system. The staging space requirements depend on the amount and size of the BCP files and attachments you plan to retire in the retirement project.
Verify that the staging space is at least four times larger than the size of the data that you plan to retire in a single retirement project.
By default, the retirement job saves the BCP files that it creates for the cluster and pool tables, to the staging space. The retirement job also downloads all attachments that are stored in the SAP database and in a file system to the staging space. For attachments that are stored in the SAP database, the job compresses and downloads the attachments to this staging space. For attachments that are stored in a file system, the job moves the attachments to the staging space.
You can leave the BCP files and attachments in the staging space. Or, you can move the BCP files attachments from the staging space to another file system, external storage, or the Data Vault. Optionally, you can configure the attachment entities to keep the attachments in the file system if you do not want to move attachments from the original file system to the staging space.

0 COMMENTS

We’d like to hear from you!