The Server Manager disabled the specified schedule because the schedule consecutively ended in error the maximum number of times allowed. For schedules that run periodically, the maximum number of consecutive failures is set in the
Maximum consecutive failures
field in the Data Replication Console.
To diagnose the error, analyze the error messages in the log files for any scheduled task that failed. Then try to correct the problem. To resume processing, you must manually start the schedule.