Table of Contents

Search

  1. Preface
  2. IDR-000000 to IDR-000720
  3. IDR-008001 to IDR-008006
  4. IDR-009001 to IDR-009055
  5. IDR-010002 to IDR-010814
  6. IDR-020001 to IDR-020267
  7. IDR-030001 to IDR-031041
  8. IDR-050001 to IDR-053223
  9. IDR-060002 to IDR-060123
  10. IDR-070002 to IDR-070356
  11. IDR-100001 to IDR-100030
  12. IDR-110030 to IDR-110031
  13. IDR-120001 to IDR-120007
  14. IDR-140001 to IDR-140054
  15. IDR-150001 to IDR-150017
  16. CDCPUB_10001 to CDCPUB_16001

IDR- 010798

IDR-
010798

[INFO] The periodic schedule
schedule_name
consecutively failed
number_of_failures
times. The Server Manager disabled the schedule.
The Server Manager disabled the specified schedule because the schedule consecutively ended in error the maximum number of times allowed. For schedules that run periodically, the maximum number of consecutive failures is set in the
Maximum consecutive failures
field in the Data Replication Console.
To diagnose the error, analyze the error messages in the log files for any scheduled task that failed. Then try to correct the problem. To resume processing, you must manually start the schedule.

0 COMMENTS

We’d like to hear from you!