Assess a PowerCenter or Model repository to review the asset details within the
repository along with their conversion feasibility to the cloud environment.
Before initiating the conversion of PowerCenter or Data Engineering Integration assets to the
cloud, it is crucial to determine the feasibility of converting the assets within a
PowerCenter or Model repository. You can find out the conversion feasibility by
assessing the PowerCenter or Model repository. When you assess a repository,
CDI-PC
creates a backup of the repository, restores the backup in IDMC, and then runs the
assessment. The assessment groups the assets into the following categories based on
their conversion criteria:
Automated:
CDI-PC
can convert these assets automatically. The converted assets do
not need any manual intervention in Cloud Data Integration after the conversion
process.
Partial:
CDI-PC
can convert these
assets to the cloud, however, you might need to do some manual tweaks on the
converted Cloud Data Integration assets.
Manual: Assets classified as manual
conversion might require redesign of the assets because there is no direct
support available for these assets in cloud. These assets cannot be migrated and
needs to be created manually created on Data Integration.
The assessment process also generates a comprehensive report detailing the reasons behind assets being categorized as partial or manual.