The dashboard of an assessed repository provides a graphical representation of the
overall migration status from PowerCenter and Data Engineering Integration to Data
Integration.
The Dashboard provides a centralized view of the PowerCenter and Data Engineering Integration
assets migration to Data Integration status of a repository. After you assess a
repository, you can access the dashboard to graphically analyze and gain insights into
the migration progress.
The dashboard displays the migration
status of a repository based on the latest assessment and conversion jobs.
The following image shows sample dashboard of a PowerCenter repository:
The dashboard displays the following details of a repository.
Assessment task results
Provides graphical representation of the latest assessment task result of a
repository. You can view a breakdown of the assets available in the repository
based on asset type and conversion potential. For PowerCenter repositories, you
can view the breakdown of workflow, worklet, session, mapping, and mapplet
assets. For Model repositories, you can view the breakdown of workflow, mapping,
and mapplet assets.
Converted assets
Displays a graphical comparison of converted and not converted assets of the
repository. For a PowerCenter repository, you can view the conversion details of
workflows. For a Model repository, you can view the conversion details of
mappings.
Top 5 Manual and Partial Flags
Displays the top five manual and partial flags for each asset type based on the
assessment result of the repository.
Connection types
Displays the details of supported and unsupported repoint connections of a
repository in a tabular format. You can download the connection details in the
CSV file format.