Table of Contents

Search

  1. Introduction
  2. Configuring Hub Console Tools
  3. Building the Data Model
  4. Configuring the Data Flow
  5. Executing Informatica MDM Hub Processes
  6. Configuring Application Access
  7. MDM Hub Properties
  8. Viewing Configuration Details
  9. Search with Solr
  10. Row-level Locking
  11. MDM Hub Logging
  12. Table Partitioning
  13. Collecting MDM Environment Information with the Product Usage Toolkit
  14. Glossary

Rule 8. Add a Record Version with a Noncontiguous Effective Period

Rule 8. Add a Record Version with a Noncontiguous Effective Period

You can add a record version with a noncontiguous effective period.
If the following conditions exist, rule 8 applies:
  • The specified effective period is not contiguous with the effective period of an existing cross-reference record.
  • The changed period end date is before the period start date or the changed period start date is after the period end date of the existing cross-reference data.
Rule 8 ensures the following
MDM Hub
behavior:
  • The existing version of the cross-reference record remains unchanged.
  • If the base object can have noncontiguous effective periods, a new version of the cross-reference record is inserted with the specified effective period.
  • If the base object must have contiguous effective periods, a new version of the cross-reference record is not inserted and an error is generated.
The following image shows cross-reference records with noncontiguous effective periods:
Cross-reference records with noncontiguous effective periods.

0 COMMENTS

We’d like to hear from you!