Common Content for Data Engineering
- Common Content for Data Engineering 10.2.2 Service Pack 1
- All Products
Property
| Description
|
---|---|
Maximum Active Connections
| Number of active connections to the Metadata Manager repository database available. The Metadata Manager application maintains a connection pool for connections to the repository database.
Increase the number of maximum active connections when you increase the number of maximum concurrent resource loads. For example, if you set the
Max Concurrent Resource Load property to 10, Informatica recommends that you also set this property to 50 or more.
Default is 20.
|
Maximum Wait Time
| Amount of time in seconds that Metadata Manager holds database connection requests in the connection pool. If Metadata Manager cannot process the connection request to the repository within the wait time, the connection fails.
Default is 180.
|