Table of Contents

Search

  1. Preface
  2. Part 1: PowerExchange Change Data Capture Introduction
  3. Part 2: CDC Components Configuration and Management
  4. Part 3: CDC Sources Configuration and Management
  5. Part 4: Change Data Extraction
  6. Part 5: Monitoring and Tuning
  7. Appendix A: CDC for z/OS Troubleshooting
  8. Appendix B: DTL__CAPXTIMESTAMP Time Stamps

Testing Adabas CDC Installation and Configuration

Testing Adabas CDC Installation and Configuration

After you install and configure Adabas CDC, test it.
  1. Update the Adabas file that you registered in the PowerExchange Navigator.
  2. Complete a PLOG switch.
  3. Review the PLOG switch job output to verify that condition code 0 was received on both the PLOG Copy and PCAT population steps.
    Record the name of the newly created archived PLOG data set name.
  4. Review the Adabas ECCR job output to verify that change data occurred. In particular, look for message PWXEDM172808I in the EDMMSG data set.
    The ECCR captures change from archived PLOGs and move the data to the PowerExchange Logger if new PCAT entries exist when the following events occur:
    • The ECCR is first started.
    • The NO_DATA_WAIT or NO_DATA_WAIT2 interval elapses.
  5. Review the PowerExchange Logger output to verify that the ECCR read an archived PLOG.
    Look for message PWXEDM172774I in the EDMMSG data set:
    PWXEDM172774I Writer
    eccr_name
    Event Mark generated: Finished with Plog copy ADABAS.DB00199.PLOG.G0022V00, last time
    timestamp
    Note the archived PLOG data set name.
  6. If you do not use PowerExchange Condense, run a database row test in the PowerExchange Navigator:
    1. Open the extraction map.
    2. Click
      File
      Database Row Test
      .
    3. In the
      DB_Type
      field, enter
      CAPXRT
      .
    4. In the
      Application
      field, enter an application name.
    5. Click
      Go
      .
  7. If you use PowerExchange Condense, complete the following steps:
    1. Enter the fileswitch command to make the condense file available for extraction processing.
    2. Review the PowerExchange Condense job output to determine if records were added to the condense file.
    3. Review the PowerExchange message log file. Look for message PWX-06415, which contains information about the completed condense process.
    4. In the PowerExchange Navigator, run a database row test.
      Enter
      CAPX
      in
      DB_Type
      field.

0 COMMENTS

We’d like to hear from you!