Table of Contents

Search

  1. Preface
  2. Part 1: Pre-Installation
  3. Part 2: Installation
  4. Part 3: Post-Installation
  5. Part 4: Apply the HotFix
  6. Appendix A: Starting and Stopping Proactive Monitoring Components
  7. Appendix B: Logging In to Client Tools
  8. Appendix C: Configure Reporting
  9. Appendix D: Installation and Configuration Checklist

Installation Guide

Installation Guide

The Installation Process

The Installation Process

The installation process consists of the following high-level phases:
  1. Pre-installation tasks. Before you run the installer, perform the following tasks to plan and prepare for the installation:
    • Verify the system requirements.
    • Prepare the PowerCenter and Proactive Monitoring databases.
    • Install the command line utilities.
    • Record installation information required by the installer.
  2. Installation. Install Proactive Monitoring in graphical mode on Windows or in console mode on UNIX. The installer completes the following tasks:
    • Creates Proactive Monitoring services.
    • Creates schemas in the Proactive Monitoring repository.
    • Validates the domain.
    • Configures and deploys web applications for configuring and monitoring the PowerCenter environment.
    • Starts the services.
  3. Post-installation tasks. After you run the installer, you perform the following post-install tasks:
    • Verify the installation.
    • Configure the node agent if you perform operations monitoring.
    • Enable dashboard alerts.
    • Import keystore file.
Refer to the instructions in this guide for detailed information. You can also use the installation checklist as a guideline when you install Proactive Monitoring.

0 COMMENTS

We’d like to hear from you!