Table of Contents

Search

  1. Preface
  2. RulePoint
  3. RulePoint Concepts
  4. Using RulePoint
  5. RulePoint Objects
  6. Working with Topics
  7. Working with Connections
  8. Working with Sources
  9. Working with Responders
  10. Working with Responses
  11. Working with Watchlists
  12. Working with Analytics
  13. DRQL
  14. Working with Rules
  15. Working with Alerts
  16. Setting Access Controls
  17. Troubleshooting RulePoint Issues
  18. Connecting to an Ultra Messaging Application
  19. Creating an Ultra Messaging JMS Source

User Guide

User Guide

Creating a Schedule

Creating a Schedule

  1. In the Source content panel, select the source for which you want to create the schedule.
    You can view the source information in
    Details View
    . The source information has the schedules column.
  2. From the menu, select
    Create Schedule
    .
    The
    Create Schedule for <source_name>
    dialog box appears.
    The schedules can either be
    Static
    or
    Dynamic
    .
  3. To set the
    Dynamic
    schedule type, enter the repeat interval.
    The interval is measured in milliseconds.
  4. To set the
    Static
    schedule type, enter the values as described in the following table:
    Property
    Description
    Starts
    Configure when to start the schedule.
    • Select
      Immediately
      to start the schedule immediately.
    • Select a date and time to start the schedule on a particular date.
    Run Every
    Configure when to run the schedules.
    • To have the schedule run at specific intervals, select the first option and specify how long between each scheduled run.
    • To have the schedule run on specific days, select the second option and then select the check boxes for the day you want to schedule to run. The source will run once per day at the time specified in the
      Starts
      section.
    Ends
    Configure when to end the schedule run.
    • To have the schedule run indefinitely, click
      No end date
      .
    • To have the schedule run a specific number of times, click
      Run 1 times
      . Type the desired number in the text box. Not available with the
      Run on Specific Days
      option.
    • To end the schedule on a particular date, click
      Run until
      . Enter the desired time.
  5. Click
    Add Schedule
    .

0 COMMENTS

We’d like to hear from you!