Table of Contents

Search

  1. Preface
  2. Part 1: Introduction
  3. Part 2: Configuring Hub Console Tools
  4. Part 3: Building the Data Model
  5. Part 4: Configuring the Data Flow
  6. Part 5: Executing Informatica MDM Hub Processes
  7. Part 6: Configuring Application Access
  8. Appendix A: MDM Hub Properties
  9. Appendix B: Viewing Configuration Details
  10. Appendix C: Row-level Locking
  11. Appendix D: MDM Hub Logging
  12. Appendix E: Table Partitioning
  13. Appendix F: Collecting MDM Environment Information with the Product Usage Toolkit
  14. Appendix G: Informatica Platform Staging
  15. Appendix H: Informatica Platform Mapping Examples
  16. Appendix I: Glossary

Step 1. Enable the Timeline in the Hub Console

Step 1. Enable the Timeline in the Hub Console

Enable the timeline for each base object that requires a timeline.
  1. Open the Model workbench and click
    Schema
    .
  2. Acquire a write lock.
  3. In the Schema tree, select a base object.
    The Schema Manager displays the Basic tab of the Base Object Properties page.
  4. From the Timeline list, select
    Dynamic Timeline
    .
  5. Configure the effective periods.
    • If you need contiguous effective periods for records, disable the
      Allow non-contiguous effective periods
      check box.
    • If you need noncontiguous effective periods for records, enable the
      Allow non-contiguous effective periods
      check box.
  6. Click
    Save
    .
The
MDM Hub
enables the timeline for the base object.

0 COMMENTS

We’d like to hear from you!