Table of Contents

Search

  1. Introduction
  2. Configuring Hub Console Tools
  3. Building the Data Model
  4. Configuring the Data Flow
  5. Executing Informatica MDM Hub Processes
  6. Configuring Application Access
  7. MDM Hub Properties
  8. Viewing Configuration Details
  9. Search with Solr
  10. Row-level Locking
  11. MDM Hub Logging
  12. Table Partitioning
  13. Collecting MDM Environment Information with the Product Usage Toolkit
  14. Glossary

Step 1. Enable the Timeline in the Hub Console

Step 1. Enable the Timeline in the Hub Console

Enable the timeline for each base object that requires a timeline.
  1. Open the Model workbench and click
    Schema
    .
  2. Acquire a write lock.
  3. In the Schema tree, select a base object.
    The Schema Manager displays the Basic tab of the Base Object Properties page.
  4. From the Timeline list, select
    Dynamic Timeline
    .
  5. Configure the effective periods.
    • If you need contiguous effective periods for records, disable the
      Allow non-contiguous effective periods
      check box.
    • If you need noncontiguous effective periods for records, enable the
      Allow non-contiguous effective periods
      check box.
  6. Click
    Save
    .
The
MDM Hub
enables the timeline for the base object.

0 COMMENTS

We’d like to hear from you!