Table of Contents

Search

  1. Introduction
  2. Configuring Hub Console Tools
  3. Building the Data Model
  4. Configuring the Data Flow
  5. Executing Informatica MDM Hub Processes
  6. Configuring Application Access
  7. MDM Hub Properties
  8. Viewing Configuration Details
  9. Search with Solr
  10. Row-level Locking
  11. MDM Hub Logging
  12. Table Partitioning
  13. Collecting MDM Environment Information with the Product Usage Toolkit
  14. Glossary

Assigning Batch Jobs to Batch Group Levels

Assigning Batch Jobs to Batch Group Levels

In the Batch Group tool, a job is a Informatica MDM Hub batch job. Each level contains one or more batch jobs. If a level contains multiple batch jobs, then all of those batch jobs are executed in parallel.

0 COMMENTS

We’d like to hear from you!